BuilderTally

Topsoil Calculator

Enter your measurements

Decimals and tape fractions both work: 38.5 and 38 1/2 mean the same length.

The finished depth once the soil is raked and firmed, not the loose pile. New Mexico State University Extension gives 4 to 6 in for a new lawn; enter 2 if you are topping up over soil that is already there.

Extra to order. No source publishes a figure for this material, so the default adds nothing.

What your supplier quotes per yd³. Leave it empty to skip the cost estimate.

Topsoil is ordered by the cubic yard but measured on site in feet and inches, and some suppliers price it by the ton instead. This calculator gives you both figures from the same area and depth, and shows the bulk density it used to convert between them.

Advertisements

How it works

Multiply length by width by depth to get cubic feet. Depth is in inches, so divide it by 12 first: a 4 inch layer is 0.333 ft. Divide the result by 27 to get cubic yards, which is the unit a bulk supplier quotes.

To get tons, multiply the cubic yards by 1.3. That is the bulk density Luck Ecosystems publishes on its premium topsoil data sheet, measured prior to full compaction at average moisture — so one cubic yard weighs about 2,600 lb, and one ton is roughly 0.77 yd³. Wet soil weighs more than this; a screened sandy blend weighs less.

The depth you enter is the finished depth you want after the soil is raked and firmed, not the height of the loose pile you dump. For a new lawn, New Mexico State University Extension gives a total topsoil depth of 4 to 6 inches after firming.

Formula: Cubic yards = (length ft × width ft × depth in ÷ 12) ÷ 27 · Tons = cubic yards × 1.3 tons/yd³

Measuring on site

  • Measure the area that actually gets soil. On a lawn renovation that means subtracting the house, the drive, the beds and the paths — often a third of the lot.
  • Split an irregular bed into rectangles, run each one, and add the yards. Curved beds are easier to measure as the rectangle that contains them; the surplus is small at 4 inches of depth.
  • Check the depth against what is already there. If you are topping up 2 inches over existing soil, enter 2 — not the 6 inch finished profile — or you will order three times what you need.

Waste and what it covers

Bulk topsoil compacts under its own weight and settles further with rain and watering, so the yardage that fills a bed on day one is not the yardage that fills it a month later. No DOT specification, NRCS document or extension bulletin we searched publishes a compaction or waste percentage for ordering bulk topsoil — the widely repeated '10 to 25% extra' traces back only to other calculators. So the waste factor here is yours to set, and we apply nothing behind your back. Crews commonly add something; we are not going to pretend we can cite a number for it.

Cubic yards and tons of topsoil by area and finished depth
Area4 in — yd³4 in — tons6 in — yd³6 in — tons
100 ft²1.231.601.852.41
500 ft²6.178.029.2612.04
1,000 ft²12.3516.0518.5224.07
2,000 ft²24.6932.1037.0448.15
Advertisements

Questions

How many yards of topsoil do I need for a 1,000 sq ft lawn?
At 4 inches finished depth, 12.35 cubic yards — about 16.05 tons. At 6 inches, 18.52 cubic yards or 24.07 tons. Both depths are inside the 4 to 6 inch range NMSU Extension gives for establishing a lawn, so the choice is yours; the difference is half again as much soil.
How many square feet does a yard of topsoil cover?
81 ft² at 4 inches deep, 54 ft² at 6 inches, and 162 ft² at a 2 inch top dressing. Coverage is inversely proportional to depth, which is why getting the depth right matters more than trimming the area.
How much does a cubic yard of topsoil weigh?
About 1.3 tons — 2,600 lb — using the published figure for screened topsoil before full compaction. Going the other way, one ton is about 0.77 yd³. Soil delivered wet after rain weighs noticeably more per yard, so a tonnage quote can buy you less volume than you expected.
How deep should topsoil be for a new lawn?
4 to 6 inches after firming, per NMSU Extension guide H-509. That is the total depth of workable soil, so if you already have 2 inches of decent soil you are adding 2 to 4, not the full profile.

Sources

Figures and sources last checked by The BuilderTally Team in August 2026.

Related calculators